Click the photo above to see shots of the construction work in process at Spohn Ranch’s premier skatepark for 2009 in Daytona Beach, Florida. This 20,000 square foot concrete skatepark is being built through a combination of pre-cast and poured-in-place concrete. By utilizing the advantages of each system, the city of Daytona Beach is truly getting the best of both worlds.
At this point, the majority of the pre-cast elements have been set in place, the poured-in-place bowl has been finished with pool coping, and all that remains is the final flat work. Stay tuned for more updates on the construction progress and the date of the Grand Opening.